Our "three phase approach" to Construction Cleanup
Phase one – “Rough Clean”
A phase one cleaning is generally requested by the GC after the framing, plumbing and electrical have been inspected and completed. This phase may be done before or after the sheetrock has been installed or what is also considered the “dried in stage”. The phase one cleaning will consist of the removal of large debris and trash, stickers will be removed from windows and the unit will be swept out. This phase will help prepare for the incoming subs for painting, flooring, fixtures and cabinetry.
Phase two – “Full Post Construction Clean-up”
This phase will consist of a detailed cleaning of the kitchen and restrooms to include: sinks, toilets, tubs, showers, countertops and cabinets. This phase includes removal of any stickers remaining on the appliances, fixtures, cabinets and windows. Cleaning baseboards, light fixtures, door frames, interior/exterior windows, window ledges, mirrors, floors vacuumed and mopped as necessary to prepare for the punch list. Important note: At this point of the construction process, various contractors may be still returning to the unit to address concerns. Phase two should be scheduled after their concerns have been addressed. Phase two cleaning items requested after the phase two cleaning has been completed and approved will be provided at an additional charge.
Phase three – “Spiff or Final Clean”
In this phase, all touch ups will be addressed and everything will be considered move in ready. The effort will finalize with the garage being swept, carpet vacuumed, floors mopped and any dust still remaining will be addressed. When this phase is approved, the site cleaning effort for this unit will be considered complete.
A phase one cleaning is generally requested by the GC after the framing, plumbing and electrical have been inspected and completed. This phase may be done before or after the sheetrock has been installed or what is also considered the “dried in stage”. The phase one cleaning will consist of the removal of large debris and trash, stickers will be removed from windows and the unit will be swept out. This phase will help prepare for the incoming subs for painting, flooring, fixtures and cabinetry.
Phase two – “Full Post Construction Clean-up”
This phase will consist of a detailed cleaning of the kitchen and restrooms to include: sinks, toilets, tubs, showers, countertops and cabinets. This phase includes removal of any stickers remaining on the appliances, fixtures, cabinets and windows. Cleaning baseboards, light fixtures, door frames, interior/exterior windows, window ledges, mirrors, floors vacuumed and mopped as necessary to prepare for the punch list. Important note: At this point of the construction process, various contractors may be still returning to the unit to address concerns. Phase two should be scheduled after their concerns have been addressed. Phase two cleaning items requested after the phase two cleaning has been completed and approved will be provided at an additional charge.
Phase three – “Spiff or Final Clean”
In this phase, all touch ups will be addressed and everything will be considered move in ready. The effort will finalize with the garage being swept, carpet vacuumed, floors mopped and any dust still remaining will be addressed. When this phase is approved, the site cleaning effort for this unit will be considered complete.